Hi everyone, I am back with another Storage Spaces Direct post. This time I would like to talk to you about planning S2D clusters from 2 node to a 16 node cluster. What you need to think about when doing your planning. This will be a multi part series covering 4 nodes, adding additional nodes. All Flash, Hybrid, MRV and the big one a 16 Node setup.
Month: June 2018
Backup problems with Backup Exec and CSV ReFS volumes
So i have been working on this case for about 4 weeks. Where a client have been having issues with CSV’s becoming unhealthy and Cache drives going into Lost Communication during backup. We have a MS Support case but as the client do not have Premier Support it’s taking a while to get trough 1st line and getting it escalated.
Patching Storage Spaces Direct
Hello Everyone
I have been starting over and over on this blog post since nov 2017 wich coinsided with me chaning jobs, wich i again just did in april of 2018 to work soly with S2D, VMM, Azure Stak and other datacenter products. So i thought it was time to get this done.